Well here is a list of things we have done to date.
  • Had the master bedroom painted (Matt did an awsome job)
  • repaired ceiling plaster in master bedroom
  • Partially fixed the fornt door jamming.
  • Painted achetraves around front door (we didn't have the door on it's hinges for a week).
  • fixed sliding mirror doors in bedroom.
  • de-molded bedroom floors
  • repaired ceiling in second bedroom, half the ceiling had to go.
  • removed 40 year old useless vents in the ceiling.
  • installed ducted gas heating
  • painted front entrance and hallway (ceiling and walls, the trim is part way there)
  • installed some new powerpoints
  • installed new switch box for power.